Six field notes on budgets, allowances, lots and schedules.
6 entries
Per-square-foot numbers from our last 31 custom homes, what moves them, and the three line items most first estimates leave out.
Allowances, exclusions, contingency and markup: what each line means and which ones decide the final invoice.
A walkout basement can add a floor for less than an addition. Here is what the slope, the soil and the drive will cost you.
Agent commissions, closing costs and moving add up to about 10% of a house. Here is how we compare that with an addition.
Why a $68,000 kitchen and a $115,000 kitchen often have the same layout, and how to set allowances you will not blow through.
Permit review, long-lead items and inspections: a realistic 12-week schedule for a 3,000 sq ft suite.