Skip to content
Weelume(865) 555-0142Request an estimate中文

Primary suite addition

Fountain City, 520 sq ft, 16 weeks, $168k-$182k

Primary suite addition · BeforePrimary suite addition · AfterBeforeAfter
Primary suite addition

Primary suite addition · After

THE BRIEF

A 1956 brick ranch with one bathroom for four people. The owners wanted a primary suite on the back that would not look added on.

WHAT WE DID

A crawlspace foundation at the existing floor height, reclaimed brick matched to the house, a tiled walk-in shower and a nine-foot closet. The roof tie-in was done in one dry week in April.

RESULT

Done in 16 weeks. Final $176,400 against a $174,900 estimate; the difference was one signed change order for a heated bathroom floor.

THE SCOPE, LINE BY LINE

Crawlspace foundation at the existing floor height|Reclaimed brick matched to the 1956 house|Tiled walk-in shower and double vanity|Roof tie-in completed in one dry week|New heat pump zone for the suite

WHAT THE OWNER SAID

“The new suite looks like it was always there. The brick match fooled our own neighbors.”

MORE TO EXPLORE

Weelume
Primary suite addition · Graybeam · Weelume construction